Excavator Productivity Calculator & Formula Online …

It calculates the volume of material excavated by an excavator in an hour, facilitating project planning and resource allocation. ... (EP) is the Excavator Productivity in cubic feet per hour ((ft^3/hr)), ... Can excavator productivity vary during a project? Yes, productivity can vary due to changes in material type, weather conditions, and ...

Excavation Time Calculator & Formula Online Calculator Ultra

Excavation rate refers to the amount of earth a machine or team can excavate per hour, typically measured in cubic meters per hour (m³/hour). This rate depends on the type of …

How Many Yards Are in an Excavator Bucket?

What Is A Bucket Of An Excavator? Before you can determine how many yards are in an excavator bucket, ... crushed stone weighs 2,500 pounds per cubic yard. Refer to the Fill Factor Data Sheet for specific materials to determine how full the bucket can be. Step 2 ... Calculate the number of cycles per hour by dividing 60 by the cycle time. Step ...

How Much Can an Excavator Dig in a Day?

A backhoe excavator can dig approximately 30-35 cubic meters per hour, depending on the type of material being excavated. This would mean that in a day, the backhoe excavator could dig between 720 and 875 cubic meters. Of course, this is all dependent on the operator's skill and the performance of the excavator itself.

How much can a mini excavator dig in a day?- Diggermate

A mini excavator, depending on these factors, can dig between dig between 50 to 100 cubic meters per day. To put it into perspective, mini excavators typically have bucket capacities ranging from 0.02 to 0.12 cubic meters. The upper end is more commonly associated with mud buckets, the digging buckets are typically around 0.04 cubic meters.

How do you calculate excavator production per hour?

For instance, if the capacity of each rotor bucket is 10 cubic feet, the wheel has only one bucket, the rotor rotates at a speed of 5 rotations per minute, and the filling factor and the soil loosening factor are one, the productivity of the excavator stands at: Q = (60*q*z*n*kf) / kl = (60*10*1*5*1) / 1 = 3,000 cubic feet per hour. kf stands ...

About how much dirt would I be able to move in a day with …

- 8 hour day - Dirt will be dumped in small piles around the lot and spread manually by someone who is not operating the Bobcat ... For material sold by the cubic yard: · Length x Width x Depth (in feet) divided by 27= Cubic Yards. ... IIRC, skyking is a dirt hand (excavator operator) and might be able to give you a decent estimate. I make a ...

Concrete Demolition

Task / Description: Slow Ave Fast Units: Hammer (2,200lb - 1,000kg) - 315C Excavator Non-Reinforced Concrete: 150cu.yd - 115m3

Solved Problem 5: (16 points) A pipeline will be …

The pipeline must be placed at the bottom of a trench that is 4 ft down from the ground surface. If the excavator bucket is 2 feet wide, how many hours will it take for the excavator to dig the trench? (Note: the excavator can fill 11 dump …

Rate Analysis of Excavation in Earthwork: …

Common metrics include excavation volume per unit of time (e.g., cubic meters per hour), cycle time (time taken for each excavation cycle), and equipment utilization rate. Collect Data : Gather relevant data on the …

Excavation Calculator

A dump truck holds anywhere from 10 to 14 cubic yards of material. Length of Excavation: ft: Width of Excavation: ft: Depth Point A: ft: ... Excavator/Tractor Fuel Consumption per Hour; Factors, Grades, Percentages. Elevation Grade Slope in a Percentage, Millimetres ...

Rate Analysis of Excavation in Earthwork: December 2024

Backhoe Excavator. Calculation of Backhoe Excavator for 10 Cu.m. Because of the rate analysis, 10 cu.m. Backhoe Excavator =25 cu.m of per hour = 25 x 8 hour (Per Day work 8 hours consider) = 200 Cu.m. per day work Backhoe Excavator. So, 10 cu.m. work for = 0.050 Days required; As per Backhoe Excavator =Tractor/Dumper

Determine Resource Requirements

• an excavator's productivity may be 100 cubic metres of dirt shifted per hour • a compactor may treat 5000 square metres in a day • a person may unload 20 bags of cement from a truck per hour. Productivity is an essential consideration when we are estimating how long a job will take or how much it will cost.

Excavator Digging Productivity | Contractor Talk

I'd guess you'd get about (6) hours of full on digging in an (8) hour day. Example - 1/2 Yard bucket, one cycle every 30 seconds = 120 cycles or 60 yards per hour X (6) …

How Is Excavator Capacity Calculated?

One of the biggest factors affecting how much an excavator can dig in a day is the bucket size of the machine, which usually ranges from 0.5 to 1.5 cubic yards of bucket capacity. The most common conventional size excavator has a bucket capacity of 1 cubic yard, while smaller excavators have a capacity closer to 0.5 cubic yards.

Concrete Work Productivity Rate

The data written below for concrete work productivity rate are the average output per hour of the task or activity. The described activity has a recommended list of teams for labor and equipment. ... Cubic Meters: 1.000 10.00 4.000 0.250 1.000 0.375 0.125 0.500 0.125 4.000: Foreman Carpenter &Steelman Mason Laborer Equip. Opt. Concrete Vibrator ...

Safe and Efficient Rock-Breaking Strategies for Excavators

Selecting the Right Tools: Effective rock breaking hinges on choosing the appropriate attachment, like hydraulic breakers, which should match the excavator's size and power as well as the rock's hardness. This foundational step is crucial for both efficiency and equipment longevity. Efficient Operating Techniques: Employing specific operating techniques, …

Excavator Productivity Calculator

Enter the total time and excavator productivity to calculate the total volume of excavation. The advanced version of this calculator incorporates additional parameters such as excavation depth, area, and machine efficiency …

Between a Rock and a Hard Place

Rocks, on the other hand, can have compressive strengths 500 times that of the hardest soils (about 25,000–30,000 psi). The amount of energy needed to break and loosen rock is proportionally greater, and so is the …

According to hydraulic breaker productivity rate to select the …

The listed Hydraulic breaker excavator productivity is based on 8-hour shifts. The above figures are for general estimation purposes only. The actual work results may depend on the quality and structure of the broken material, the material reduction size reduction, installation, carrier conditions, job site conditions, transportation, operator skills, etc.

How Much Can a Mini Excavator Dig in a Day?

The average mini excavator can dig around 200 to 300 cubic yards (153 to 229 cubic meters) of dirt daily, but this depends on the type of soil, excavator's bucket capacity, and the experience level of the person operating the excavator. ... (0.38 cubic meters) and an estimated working time of 6 hours in an 8-hour work day. ...

2024 Excavation Costs — Calculator & Prices By Project & Hour …

To estimate your total excavation cost, enter the area's length, width, and depth into a cubic yard calculator.. Excavator hourly rates. Excavator hourly rates are $100 to $300 per hour for operators with their own mini excavator, backhoe, or skid-steer loader. Hiring an operator without equipment costs $50 to $150 per hour.Most operators charge a minimum of one day or …

Excavation production rates

How many cubic yards per hour do you think you can dig out and pile (within 20ft away) when digging out for a standard driveway @ 16" depth? Lets assume 1,200sfqt, …

Production Rate Table

Item. Unit. Expected Production Range (1) Concrete Masonry, Bridges (Foundation Substructure) CY/DAY. 13 - 39, 20 typ. Parapet LF/DAY; 45 - 120, 60 typ.

How to Perform Rate Analysis for Earth Excavation? [PDF]

From table-2, the cost per day, including driver and fuel for a hydraulic excavator is Rs. 5000. Then the cost of 10m 3 of excavation can be calculated as: No. of days required for 10m 3 excavation = 10/242.4242 = 0.04125 days. The cost of hydraulic excavator for 10m 3 excavation = 0.04125x5000 = Rs 206.25

How many cubic meter will excavate a backhoe per hour?

The cubic meters of aggregate that a backhaul can excavate in an hour is dependent upon the size of the backhoe. Typically, a backhoe can ask of a 100 cubic meters of aggregate per hour.

How Much Can An Excavator Dig In A Day? [Includes Formula]

For example, an excavator with a 1 cubic yard capacity (which is typical) operated by an experienced operator who can perform 120 cycles per hour (2 per minute) and perform …

Excavation Time Calculator

The amount an excavator can excavate in an hour depends on factors like the size of the excavator, the type of soil, the efficiency of the operator, and the specific conditions. On average, an excavator might move around 50 to 100 cubic yards of material per hour.

Trying to guess how many man hours to spread pea gravel.

I estimate 9 tons of pea gravel. The back yard is fenced in with a single gate about 36 inches. and the only way I can think to get it back there would be to use a wheel barrow. It will be two of us. How many man hours should I estimate. Is there another way to get it in the back yard? Can you get a stone slinger close? It will sling up to ...

How to Choose the Right Excavator Bucket

Divide the nominal bucket capacity by the fill factor. This number tells you exactly how many cubic yards of material you will be able to lift with each cycle. Excavator Bucket Customization and Accessories. To tool your excavator bucket for whatever applications you have in store, you can customize the bucket with many add-on features:

Mini Excavator Sizes: Choosing the Right Size | BigRentz

How much a mini excavator can dig in a day depends on several factors, such as the size of the excavator, the soil conditions and the desired depth. As a general rule of thumb, a mini excavator can typically dig between eight to 12 cubic yards of soil per hour, which translates to about 64 to 96 cubic yards of soil per eight-hour day.

How to Calculate ® Wheel Loader Productivity

Improve productivity and lower heavy equipment operating costs with Global Supervisor Training and Jobsite Analysis. ... if a hopper can handle 300 tons per hour (272 metric tons), then your loader should be capable of moving slightly more than 300 tons per hour (272 metric tons). ... Bear in mind that the bulk of material handled ...

Excavation Time Calculator

Input: Enter the volume (V) as 1,000 cubic yards, the excavation rate (R) as 50 cubic yards per hour, and the work hours per day (H) as 8 hours. Calculate: Click the "Calculate" button. The result will be 2.5 days. This means it will take approximately 2.5 days to excavate 1,000 cubic yards of material with the given parameters.

Hydrovac Excavation 101: Everything You Need to Know

Unlike traditional excavation, where the heavy equipment operators are physically removed from the ground they're excavating, a hydrovac operator is directing the high-pressure water jet by hand. ... While both methods use vacuum suction to remove debris, air vacuum excavation only uses air to break up the sediment. Air vacuum excavation does ...

Number of Truckloads to Remove Excavated Material in …

Truck loads come in large range of sizes. 9 tonne Tipper truck 6 cubic metres of sand or gravel up to 9 cubic metres of mulch 6 wheeler truck 10 cubic metres of sand or gravel and up to 15 cubic metres of mulch

Excavator Bucket Size Chart: How To Choose the …

For example, if you must move 500 tons per hour, and the cycle rate is 120 cycles per hour, you must move 500/120 = 4.17 tons per cycle. ... Excavators can fit many specialized excavator bucket attachments designed …